1951 West Park Road, Elizabethtown, KY 42701
E-mail us: customercare@hcwd2.org
Monday through Friday - 8:30am to 4:30pm
Follow us:

Design Standards

Plan Reviews

When is a plan review required?
The District requires that all projects involving the installation of a 3-inch or larger connection must be reviewed and approved prior to construction.

If a project contains any one of the following, plan reviewing is required:

• Main extensions for new development

• Fire hydrants

• Fire service connections

• Domestic connections 3-inch or larger

• Water line relocation or modifications

Plans shall be prepared, stamped, and signed by a PE licensed by the State of Kentucky. Plans must meet the requirements and specifications detailed in the District’s Construction Standards & Specifications and follow the Water Construction Plans Checklist. Any deviation from these standards will result in plan rejection.