The District requires that all projects involving the installation of a 3-inch or larger connection must be reviewed and approved prior to construction.
If a project contains any one of the following, plan reviewing is required:
• Main extensions for new development
• Fire hydrants
• Fire service connections
• Domestic connections 3-inch or larger
• Water line relocation or modifications
Plans shall be prepared, stamped, and signed by a PE licensed by the State of Kentucky. Plans must meet the requirements and specifications detailed in the District’s Construction Standards & Specifications and follow the Water Construction Plans Checklist. Any deviation from these standards will result in plan rejection.